Picture this: youâre embarking on a remodeling project, and everything seems to be going according to plan. But as we begin, we discover something lurking behind the wallsâperhaps not a ghost, but some unforeseen structural issue. Enter: the change order!
Change Orders! The term can sound ominous, even haunting to our clients. Some worry it means reaching deeper into their pockets than theyâd planned, which can be scary indeed.
So, Whatâs a Change Order, Really?
A change order is simply a formal document that outlines any modifications to the original construction contract. This can include changes in scope, materials, costs, or timelines. Change Orders become necessary when unexpected issues arise or when the client requests alterations to the original plans. They help ensure both the contractor and the client are on the same page, keeping things clear and transparent. No tricks!
The Top 4 Ghoulish Causes of Change Orders
1. Allowances
Every project starts with allowancesâthink cabinets, plumbing fixtures, flooring. These allowances are based on current prices and your budget, but if costs shift up or down, it triggers a change order. No need to worry; it just means we're adjusting to make sure youâre not haunted by unexpected expenses later.
2. Spooky Surprises in the Walls or Floors
The demolition phase can reveal some ghostly secrets. Sometimes, itâs damage from termites, water rot, or even a missing structural beam. These frightful finds are part of the reason to use a licensed contractor and have a building permit. We make sure that, unlike a haunted house, everything in your project is done correctly and safely.
3. A Bewitching New Idea
Once we start, itâs not uncommon for clients to have a stroke of inspiration. Maybe you want to open up that kitchen to the dining roomâvoila, a change order to bring your new vision to life! Nothing wrong with a little magic mid-project.
4. âA Chilling TwistâŚâ
You know how it goes: when the veil between worlds is thin and our electricians, plumbers, and carpenters are on-site, those extra little tasks youâve been meaning to tackle seem to whisper from the shadows. These âwhile youâre hereâ requests creep onto our project lists like specters, turning into change orders that echo through the job. But donât worryâitâs the perfect opportunity to get that additional work done before the witching hour strikes, while weâre still lurking around!
Donât Let Remodeling Be a Fright!
A remodeling project can feel ominous, but with clear communication and careful planning, weâll work together to keep things from going bump in the night. Letâs chat about your project! Call Calyx at 401-334-9110 or email us at Inquire@CalyxBuilds.com. Happy Halloween! đ
çč¨